Abstract
This contribution presents some results from the first feasibility measurement performed at GSI using a 350 MeV/nucleon (136)Xe beam and a Hydrogen gas-jet target. In this feasibility study, one element of every possible detection part of the future EXL detection system was investigated. In addition, simulation results for EXL setup will be presented.
Original language | English |
---|---|
Pages (from-to) | 524-530 |
Number of pages | 7 |
Journal | International journal of modern physics e-Nuclear physics |
Volume | 18 |
Issue number | 2 |
DOIs | |
Publication status | Published - Feb-2009 |
Event | 7th International Conference on Nuclear Physics at Storage Rings - Duration: 14-Sept-2008 → 18-Sept-2008 |